Between 1999 and 2002 the National Endowment for the Arts's New Public Works program sponsored design competitions in cities across the United States. The forward-thinking designs that emerged have influenced the physical form of major public works projects nationwide. New Public Works presents a history of the program, along with interviews with participants. Special attention is paid to the key role played by private, municipal, and other public funding sources. Case studies of three built projects by Allied Works Architecture, Koning Eizenberg, and Weiss/Manfredi Architecture describe the path of each from competition through construction.
52 Stephen Kieran and James Timberlake , “ Paradise Regained , ” Architecture 80 ( December 1991 ) : 48–51 ; the quotation is on pages 48–49 .
... Joe, 211 Kelly, William, 12 Kieran Timberlake, 28, 29 killed steels, 22 Kure Beach (North Carolina), weathering evaluated in, 275 M machining, 225–226, ...
Brender, Jean D., Juliana A. Maantay, and Jayajit Chakraborty. 2011. ... Chris Frost, Katharine Ker, Rebecca Steinbach, Ian Roberts, and Reinhard Wentz.
In the Army and the Navy, everyone had both line and staff duties. Line duty was your primary mission—say, as a gunnery officer—which you did while being ...
... The Faison School for Autism is a unique and welcoming learning environment that encompasses the needs of its students, staff, and families alike.
"A must for practitioners and students alike, Manual brings the process of design and details of architecture to life, revealing the beauty of building derived from composition within a tradition of innovative assembly."--BOOK JACKET.
Projects in this book include a house made from prefabricated modules in rural California that minimally disturbed its picturesque site; a major renovation of Philadelphia's Dilworth Park in front of City Hall; Cellophane House (TM), a ...
This thought-provoking book presents a compelling argument for moving architecture from a part-by-part, linear approach to an integrated one that brings together technology, materials, and production methods.
Through a series of questions, the book explores several of KieranTimberlake's ongoing research agendas including speed of on-site assembly, design for disassembly, a holistic approach to the life cycle of materials, and the development of ...
Through the use of state-of-the-art building information modeling, the architects were able to streamline the design-build process. This is a manual for the componentized prefab.